Cost • Schedule • Risk • Reporting

Project Controls Consulting

Cost tracking, planning and scheduling, earned value, forecasting, KPIs and reporting that give owners and contractors one reliable picture of project performance.

Operators monitoring a plant from a control room
The problem

Where projects lose time and money

Most industrial projects do not fail on engineering. They drift: a baseline nobody trusts, progress measured three different ways, a forecast that only changes once the overrun is already certain.

Surus sets up and runs project controls that management can actually use for decisions. We work for owners, EPC contractors and engineering firms, either building a controls function from scratch or strengthening the one already in place.

Scope

What the work covers

Take the full scope or the parts your team needs. Each item can be run remotely, on site, or both.

  1. Planning & scheduling

    Level 1–4 schedules, WBS and coding structures, baseline development, critical path and float analysis, schedule health checks (DCMA-style), look-ahead and short-interval planning.

  2. Cost control & forecasting

    Control budgets, commitments and actuals tracking, estimate-at-completion (EAC) forecasting, cash-flow curves and contingency drawdown management.

  3. Earned value management

    Progress measurement rules of credit, physical progress capture, SPI / CPI tracking and variance analysis that explains causes, not just numbers.

  4. Change & risk management

    Change control procedures, trend registers, quantitative schedule and cost risk analysis, and risk-adjusted forecasts.

  5. Reporting & dashboards

    Weekly and monthly reports, executive dashboards and KPI frameworks built from a single source of truth.

  6. Contractor controls oversight

    Review of contractor schedules, progress claims and forecasts on behalf of the owner, with clear acceptance criteria.

Approach

How an assignment runs

Four steps, sized to your project. We work inside your team and your tools rather than beside them.

  1. 01

    Diagnose

    Review the current baseline, tools, data flows and reporting to see where reality and reports diverge.

  2. 02

    Structure

    Define WBS, coding, procedures and rules of credit so cost, schedule and progress speak the same language.

  3. 03

    Run

    Operate the controls cycle — update, analyse, forecast, report — alongside your team.

  4. 04

    Transfer

    Hand over tools, templates and know-how so performance holds after we step back.

Results

What changes for your project

  • Earlier warning of cost and schedule overruns
  • Forecasts management can trust and act on
  • One version of the truth across owner and contractors
  • Less time producing reports, more time acting on them
FAQ

Questions clients ask

What does a project controls consultant do?

A project controls consultant sets up and runs the processes that measure and forecast a project’s cost, schedule and progress — planning and scheduling, cost control, earned value, change control, risk analysis and reporting — so that management can see problems early and decide with reliable data.

Which planning and scheduling tools do you work with?

We work with the tools commonly used on industrial projects, such as Primavera P6 and Microsoft Project for scheduling, and Excel or Power BI for cost models and dashboards. We adapt to your existing systems rather than imposing new software.

Do you work for owners or contractors?

Both. For owners we typically provide independent controls oversight of contractors; for EPC contractors and engineering firms we strengthen internal planning, cost control and reporting.

Can you support projects outside your home country?

Yes. Surus supports projects worldwide, combining remote controls support with on-site presence when the project phase requires it.

Contact

Planning a shutdown or a capital project?

Tell us the asset, the window and where it is. A senior consultant replies within one business day.