Where projects lose time and money

A turnaround is the most intense period in a plant’s life: thousands of activities, hundreds of contractors and every day offline costing production. The outcome is largely decided long before the first flange is opened — in scope definition, planning quality and readiness.

Surus supports owners and contractors across the full STO lifecycle — in refineries, chemical plants and GMP pharmaceutical facilities — bringing the structure and discipline needed to deliver turnarounds safely, on time and on budget.

Scope

What the work covers

Take the full scope or the parts your team needs. Each item can be run remotely, on site, or both.

  1. Strategy & scope definition

    Turnaround objectives, scope gathering and challenge, scope freeze governance and late-scope management.

  2. Planning & work packs

    Work package preparation, job plans, resource and crane loading, materials and long-lead item tracking.

  3. Integrated scheduling

    Shutdown, mechanical and start-up schedules with critical path, hour-by-hour detail and realistic durations.

  4. Readiness reviews

    Milestone-based readiness assessments covering scope, planning, materials, contractors, permits and logistics.

  5. Execution control

    12/24-hour progress updates, emergent work control, critical path management and daily performance reporting.

  6. Close-out & lessons learned

    Cost close-out, performance review and lessons learned that are actually carried into the next event.

Approach

How an assignment runs

Four steps, sized to your project. We work inside your team and your tools rather than beside them.

  1. 01

    Initiate

    Set objectives, governance, milestones and the preparation timeline — typically 12 to 24 months before the shutdown.

  2. 02

    Prepare

    Define and freeze scope, build work packs and the integrated schedule, secure materials and contractors.

  3. 03

    Execute

    Control progress around the clock, manage emergent work and protect the critical path.

  4. 04

    Close

    Close out cost and scope, capture lessons learned and feed them into the next turnaround.

Results

What changes for your project

  • Scope that is challenged, frozen and controlled
  • Realistic schedules and fewer surprises during execution
  • Better control of emergent and late-added work
  • Shorter, safer and more predictable shutdowns
FAQ

Questions clients ask

What is STO management?

STO stands for Shutdowns, Turnarounds and Outages: planned periods when a plant or unit is taken offline for inspection, maintenance, repairs and modifications. STO management covers the preparation, planning, execution and close-out of these events.

How early should turnaround planning start?

For a major turnaround, preparation usually starts 12 to 24 months ahead, with scope freeze and key readiness milestones set well before execution. Smaller shutdowns and outages can run on shorter cycles, but the same milestone logic applies.

What is the difference between a shutdown and a turnaround?

The terms are often used interchangeably. “Turnaround” usually refers to a planned, periodic, plant-wide or unit-wide event in refining and petrochemicals, while “shutdown” and “outage” are used more broadly across industries such as mining, power and pharmaceuticals.

Can you support execution on site?

Yes. We support preparation remotely or on site and provide planning and controls presence during execution when required.

Contact

Planning a shutdown or a capital project?

Tell us the asset, the window and where it is. A senior consultant replies within one business day.