Use case · Pharmaceutical & Life Sciences

GMP facility shutdown: scheduling qualification into the window

How a pharmaceutical manufacturer plans a short shutdown for modifications and maintenance, with commissioning, qualification and validation built into the critical path.

Typical client
GMP manufacturing, fill-finish or API facility
Timing
Short, fixed shutdown window to protect product supply
Operator in a cleanroom suit loading vials into a pharmaceutical freeze-dryer
The situation

Where the project stands

A GMP facility schedules a shutdown to modify a production line and carry out maintenance. Engineering plans the works, but requalification, validation and QA release are planned separately, so the real restart date is unclear.

What makes it hard

  • Commissioning, qualification and validation planned outside the works schedule
  • Change control and documentation steps that can delay restart
  • A short window with no room for slippage
  • Engineering, QA, validation and production with different priorities
Approach

How Surus works on it

  1. 01

    Map the path to release

    List every step from mechanical completion to QA release, including protocols, executions, deviations and approvals.

  2. 02

    Integrate CQV

    Build commissioning, qualification and validation activities into the shutdown schedule with their real durations and dependencies.

  3. 03

    Align the teams

    Agree one schedule and one meeting rhythm between engineering, QA, validation and production.

  4. 04

    Control to restart

    Track progress, documentation and approvals daily until the line is released back to production.

Deliverables

What the client receives

  • Shutdown schedule including CQV and QA release
  • Document and approval tracker
  • Daily progress and readiness reporting
  • Restart plan agreed with QA and production
Outcome

What changes on the project

  • A restart date based on the full path to release, not only the works
  • Quality milestones visible on the same plan as engineering work
  • Fewer surprises between mechanical completion and release
  • Product supply protected by a window that holds