The situation

Where the project stands

A refinery plans a major turnaround of several units. Scope requests are arriving from maintenance, inspection and projects, the preparation team is small, and the shutdown date is fixed by the production plan.

What makes it hard

  • Scope lists from several departments that overlap and keep growing
  • No single milestone plan that every department works to
  • Long-lead equipment identified late
  • Contractors engaged before work packs are ready
Approach

How Surus works on it

  1. 01

    Set the premises

    Agree objectives, targets for safety, duration and cost, governance and decision rights, and publish the preparation milestone plan.

  2. 02

    Challenge the scope

    Run scope challenge sessions item by item, link each item to its justification, and set a firm freeze date with a late-scope procedure.

  3. 03

    Build the plan

    Develop work packs and the integrated shutdown schedule, load resources and cranes, and track materials and long-lead items against need dates.

  4. 04

    Review readiness

    Hold readiness reviews at fixed milestones, report what is on track and what is not, and agree recovery actions while there is still time.

Deliverables

What the client receives

  • Turnaround premises and milestone plan
  • Challenged, frozen scope list with justifications
  • Work packs and integrated turnaround schedule
  • Materials and long-lead tracking register
  • Readiness review reports at each milestone
Outcome

What changes on the project

  • One scope list, frozen on a known date
  • Late additions visible, justified and approved, not slipped in
  • Preparation status that management can read at a glance
  • An execution phase that starts from a realistic schedule